This might already exist somewhere in the world, but I haven't been able to find a program that does what I'm looking for.
I often work on shows where I'm adding multiple positions and have to put an order and cut list together for sched. 40 pipe. I would love to be able to manage my pipe projects in the worksheet or on a different page so that I can spec the individual lengths of pipe I'll need for each position, then have the software auto-generate an order and cut list that minimizes waste while also taking into account which lengths need threads. For example, if Project A needs 6@ 8' threaded pipes, and Project B needs 6@ 4' pipes and 4 @ 12' threaded pipes, I'd want the program to spit out a cut list so the first 4@ 21' pipes are listed as "8' --> 1' spare -->12'", then the next pipes are listed as "8' -->4'-->4'-->4'--> 1' spare" "8' --> 4' --> 4'--> 4'-->1' spare"